+91 96876 57558 Enquire

Why Sarabhai Green Energy

Indigenous IP, ISRO and corporate engineering pedigree, and true hybrid redundancy — in a portable 1–30 kW form factor that sits between power banks and rooftop solar.

Core Differentiators

Four things that set SGE apart

Most off-grid power is either too small to matter or too fixed to move. SGE was engineered for the space in between.

01 /

Indigenous Patent-Pending Multi-Input Architecture

Designed and built in India. Our multi-input architecture is protected by patent pending technology stack.

Patent Pending · Indigenous IP

02 /

ISRO & Corporate Engineering Pedigree

Mentored by retd Group Director as well as mentored by a material scientist, and led by proven product commercialisation expertise.

VSSC · ISRO · L&T · 3M · GE · Honeywell

03 /

True Hybrid Redundancy

Renewable-first operation on solar and wind, with a micro-fossil-fuel engine as backup — so power keeps flowing through cloudy days, still nights and extended deployments.

Renewable + Micro-Engine Backup

04 /

Sweet-Spot 1–30 kW Mobility

Bridges the gap between low power banks and static rooftop solar installations— real capacity that still moves with your crew.

1–30 kW · Portable

Where the HPG fits

Power Banks <50 Wh Portable, but far too small for drones, EVs or field equipment.
SGE Hybrid Portable Power Generator 1–30 kW Portable and high-capacity, with multi-source charging on site.
Rooftop Solar >10,000 Wh High capacity, but static — fixed to a building.

Cost Economics

SGE hybrid vs conventional generators

A side-by-side view of what it really costs to power field operations — upfront, every day, and over the asset’s life.

Comparison of the SGE Hybrid Solar/Storage System with a conventional petrol/diesel generator
Parameter SGE Hybrid Solar / Storage System Conventional Petrol / Diesel Generator
Initial Capital Cost Integrated panels, inverter & battery Generator capital cost
Operating & Maintenance Cost Minimal O&M Regular engine maintenance
Running Fuel Cost Zero fuel cost (solar mode) High recurring fuel cost
Lifespan 25–30 years (solar asset life) 10–15 years
Cost of Energy / Storage LCOS ~ ₹10/kWh* LCOE ~ ₹50–70/kWh
Environmental Impact Zero harm, silent High emissions + heavy noise

* Cost of energy

Interactive Estimator

Estimate your annual energy cost

10 kWh
250 days

Annual energy delivered

2,500 kWh / year

SGE Hybrid · LCOS ₹10/kWh₹25,000
Conventional generator · ₹50–70/kWh₹1,25,000 – ₹1,75,000
Indicative annual saving with SGE ₹1,00,000 – ₹1,50,000

Indicative only. Based on SGE’s ~₹10/kWh LCOS versus ~₹50–70/kWh LCOE for conventional petrol/diesel generators. Actual costs vary with site conditions, duty cycle and fuel prices.

Pilots & Partnerships

Need dependable power where the grid ends?

We welcome pilot trials and B2B commercial enquiries from drone OEMs, drone service providers, Light EV operators, remote biomedical equipment operators and remote project sites operators.